Our advantage
Global Logistics
We have a 10-year logistics and express cooperation agreement, so our products can be shipped to any place in the world.
Brand new and original
Our products are imported in bulk from the place of origin. Because of the cooperative relationship, our products are all original and 100% new.
24-hour service
We provide 7*24 hours service to our customers. We will be there whenever you need us.
Price advantage
All our products are priced very favorably because we have our own warehouse and supply.
| Company Information | |||
| [email protected] | |||
| Mobile | +8615980777398 | ||
| +8615980777398 | |||
| 15980777398 |

The Woodward CSC3BUERADAP SPM-A Synchronizer with 1% Voltage Matching is identified as a generator synchronization device intended to coordinate the electrical conditions of an incoming generator with an energized bus. Its primary role is to match frequency and phase angle and, with its voltage-matching function, help bring generator voltage into the required relationship with the bus before the generator circuit breaker closes.
In a power-generation installation, a generator cannot be connected to an energized bus solely because its frequency appears correct. The phase relationship and voltage difference must also fall within the limits established for the installation. If these conditions are not satisfied, closing the breaker can produce substantial electrical and mechanical transients. The synchronizer coordinates the adjustments needed to prepare the incoming generator for connection.
The SPM-A synchronization principle uses speed-bias signals to influence a compatible governor and voltage-correction signals to interface with a suitable voltage regulator. The governor adjusts prime-mover speed, while the excitation-control system adjusts generator voltage. The synchronizer evaluates the resulting electrical conditions and provides a breaker-close command when the configured synchronization requirements are met.
The 1% voltage-matching designation distinguishes this configuration from SPM-A versions without automatic voltage matching or models with different voltage-matching specifications. The exact CSC3BUERADAP ordering reference should be retained when identifying the required replacement, particularly when the installed system uses a specific output arrangement or customized assembly designation.
The synchronizer is one component of the complete generator-paralleling system. Correct operation depends on compatible voltage-sensing circuits, the governor, excitation controls, the breaker-control circuit, and the required protective interlocks.
| Parameter | Specification |
|---|---|
| Manufacturer | Woodward |
| Model / Part Number | CSC3BUERADAP |
| Product Family | SPM-A |
| Product Type | Synchronizer with 1% Voltage Matching |
| Primary Function | Generator frequency, phase, and voltage matching |
| Voltage-Matching Specification | 1% |
| Operating Frequency | 50/60 Hz for the corresponding standard SPM-A configuration |
| Generator and Bus Voltage Inputs | 115 or 230 V AC RMS for the corresponding standard SPM-A configuration |
| Phase-Matching Function | Automatic phase and frequency matching |
| Breaker-Close Output | Normally open relay contact on the standard SPM-A configuration |
| Operating Modes | RUN, CHECK, PERMISSIVE, OFF on the standard SPM-A configuration |
| Power Consumption | Maximum 5 W on the standard SPM-A configuration |
| Dimensions | 120 × 100 × 60 mm |
| Weight | 1.2 kg |
The synchronizer compares voltage signals from the incoming generator and the energized bus. These signals allow the device to evaluate the frequency difference, phase relationship, and voltage mismatch before connection.
A typical synchronization sequence follows this path:
Incoming Generator and Energized Bus → Voltage-Sensing Circuits → SPM-A Synchronizer → Governor and Voltage Regulator → Breaker-Close Circuit
When the incoming generator frequency differs from the bus frequency, the synchronizer sends a speed-bias signal to the compatible governor. The governor adjusts the prime mover’s speed, changing the generator frequency and influencing the rate at which the phase angle moves toward the required closing position.
Voltage matching operates through a separate control path. If the generator voltage differs from the bus voltage, the synchronizer provides a correction signal to the compatible voltage regulator or excitation-control circuit. The regulator adjusts generator excitation to bring the voltage toward the required matching condition.
The 1% voltage-matching specification describes the matching capability of the designated SPM-A configuration. Actual performance depends on the associated regulator, sensing accuracy, wiring, and system adjustment.
Once the configured synchronization conditions are satisfied, the synchronizer can issue a breaker-close command. The command must be coordinated with the circuit breaker’s mechanical operating time and the external closing circuit so that the generator is connected within the permitted synchronizing window.
The standard SPM-A platform provides several operating modes. RUN supports automatic synchronization and breaker closure; CHECK allows synchronization behavior to be evaluated without normal breaker closure; PERMISSIVE checks synchronization conditions without normal speed trimming or voltage matching; and OFF disables the synchronizing function.
The synchronizer does not independently control prime-mover speed or generator excitation. Those functions remain with the connected governor and voltage regulator. Generator protection and any required independent synchronism-check functions must also be provided as part of the complete installation.
The CSC3BUERADAP SPM-A synchronizer occupies the coordination layer between generator electrical measurements and the external control equipment responsible for speed, excitation, and breaker operation.
Generator and Bus Voltage Measurements → Synchronizer → Governor and Voltage Regulator → Breaker-Close Circuit
| System Component | Function |
|---|---|
| Woodward CSC3BUERADAP | Coordinates generator frequency, phase, and voltage matching |
| Incoming Generator | Supplies the electrical source to be synchronized |
| Energized Bus | Provides the electrical reference for matching |
| Generator Voltage-Sensing Circuit | Supplies the incoming generator voltage signal |
| Bus Voltage-Sensing Circuit | Supplies the bus voltage reference |
| Governor or Load-Sharing Control | Adjusts prime-mover speed in response to synchronizer commands |
| Automatic Voltage Regulator | Controls generator excitation and voltage |
| Breaker-Close Relay | Provides the synchronization-related closing command |
| Generator Circuit Breaker | Connects the incoming generator to the bus |
| Synchronism-Check Relay | Provides additional closing supervision where required |
| Generator Protection System | Detects electrical faults and initiates protective action |
| Application | Typical Use |
|---|---|
| Diesel Generator Plants | Matching incoming generator frequency, phase, and voltage before paralleling |
| Gas Engine Power Stations | Coordinating governor and excitation adjustments during synchronization |
| Steam-Turbine Generator Sets | Preparing turbine-driven generators for connection to an energized bus |
| Standby Power Systems | Synchronizing additional generating capacity where parallel operation is required |
| Industrial Power Plants | Connecting generators to a common electrical bus |
| Combined Heat and Power Facilities | Coordinating generator entry into an existing plant power system |
| Remote Power Stations | Synchronizing generators in isolated or local power networks |
| Multiple Generator Installations | Bringing individual generating units online under coordinated control |
| Industrial Utility Systems | Integrating synchronization into generator switchgear |
| Generator Retrofit Projects | Replacing an existing synchronizer while preserving the required control interfaces |
| Component | Function |
|---|---|
| Woodward CSC3BUERADAP | Provides the specified SPM-A synchronization function |
| Compatible SPM-A Voltage-Matching Configuration | Supports generator voltage correction during synchronization |
| Woodward 2301 Load-Sharing Control | Supports compatible high-impedance synchronizer output arrangements |
| Woodward 2301A Load-Sharing and Speed Control | Supports compatible low-impedance output arrangements |
| Woodward Electrically Powered Governor (EPG) | Controls prime-mover speed in supported configurations |
| Automatic Voltage Regulator | Adjusts generator excitation and voltage |
| Generator Voltage-Sensing Circuit | Supplies generator voltage measurements |
| Bus Voltage-Sensing Circuit | Supplies the reference voltage measurements |
| Generator Circuit Breaker | Connects the incoming generator to the energized bus |
| Breaker-Control Circuit | Processes the synchronizer’s closing command |
| Synchronism-Check Relay | Provides additional closing supervision where required |
| Generator Protection Equipment | Provides electrical fault protection and required interlocks |
| Model | Product Type | Selection Consideration |
|---|---|---|
| Woodward CSC3BUERADAP | SPM-A Synchronizer with 1% Voltage Matching | Reference model; preserve the complete ordering designation when replacing the installed unit |
| Woodward 9907-029 | SPM-A Synchronizer with 1% Voltage Matching | Standard SPM-A reference for 50/60 Hz operation with a ±10° phase window |
| Woodward 9905-005 | SPM-A Synchronizer with 1% Voltage Matching | Standard configuration with a ±5° phase window |
| Woodward 9905-001 | SPM-A Synchronizer without Voltage Matching | Alternative for systems where voltage matching is handled separately |
| Woodward 9905-003 | SPM-A Synchronizer with 5% Voltage Matching | Alternative voltage-matching specification |
| Woodward 9905-006 | SPM-A Synchronizer with 0.5% Voltage Matching | Alternative with a different voltage-matching specification |
| Woodward 9905-009 | SPM-A Synchronizer with 10% Voltage Matching | Alternative voltage-matching specification for suitable applications |
Voltage matching helps reduce the difference between incoming generator voltage and bus voltage before the circuit breaker closes. The specified 1% matching capability identifies the intended configuration, while actual performance depends on the regulator and measurement circuit.
It sends a speed-bias command to a compatible governor. The governor changes prime-mover speed, adjusting generator frequency and moving the phase relationship toward the configured synchronization window.
CHECK is used to evaluate synchronization behavior without normal breaker closure. PERMISSIVE checks whether synchronization conditions are acceptable without normal speed trimming or voltage matching. The external mode wiring and breaker-control logic must implement the intended behavior correctly.
Do not assume direct interchangeability from the shared SPM-A designation and 1% voltage-matching function alone. Compare the complete ordering reference, phase window, output arrangement, connections, and physical installation requirements before substitution.