Our advantage
Global Logistics
We have a 10-year logistics and express cooperation agreement, so our products can be shipped to any place in the world.
Brand new and original
Our products are imported in bulk from the place of origin. Because of the cooperative relationship, our products are all original and 100% new.
24-hour service
We provide 7*24 hours service to our customers. We will be there whenever you need us.
Price advantage
All our products are priced very favorably because we have our own warehouse and supply.
| Company Information | |||
| [email protected] | |||
| Mobile | +8615980777398 | ||
| +8615980777398 | |||
| 15980777398 |

The GE SR489-CASE 489-P1-HI-A20-E Generator Management Relay is a configured version of the GE Multilin 489 protection platform for small and medium-sized synchronous or induction generators. It combines electrical protection, generator metering, temperature monitoring and fault diagnostics in a drawout relay assembly used in generator switchgear and control panels.
The P1 configuration accepts 1 A phase current-transformer secondary signals, making CT selection and ratio configuration important during commissioning. The HI power option supports high-range AC or DC auxiliary supplies, while A20 specifies 4–20 mA analog outputs for transmitting selected measurements to compatible external equipment. The E option adds an enhanced display with a larger LCD and improved keypad.
In a generator protection scheme, the relay evaluates electrical measurements and connected monitoring signals against configured settings. It can initiate assigned trip or alarm responses when enabled protection elements detect qualifying conditions. Event records, waveform capture and metering data also help engineers examine disturbances and investigate generator trips.
| Parameter | Specification |
|---|---|
| Manufacturer | GE |
| Model / Order Number | SR489-CASE 489-P1-HI-A20-E |
| Product Family | GE Multilin 489 |
| Product Type | Generator Management Relay |
| Phase CT Input Option | P1 |
| Phase CT Secondary Rating | 1 A |
| Control Power Option | HI |
| DC Control Power Input | 90–300 V DC |
| AC Control Power Input | 70–265 V AC |
| AC Control Power Frequency | 48–62 Hz |
| Analog Output Option | A20 |
| Analog Output Range | 4–20 mA |
| Display Option | E — Enhanced display with larger LCD and improved keypad |
| Digital Inputs | 9 opto-isolated inputs |
| RTD Monitoring | Supports up to 12 RTD inputs |
| Analog Transducer Inputs | Supports configured current-input signals for monitoring applications |
| Communication Interfaces | Front-panel RS232 and RS485 serial interfaces |
| Communication Protocols | Modbus RTU, DNP 3.0 |
| Protection Functions | Configurable generator electrical, differential, ground-fault and thermal protection |
| Construction | Drawout relay and fixed case |
| Dimensions | 252 × 216 × 224 mm |
| Weight | 7.7 kg |
The 489 receives generator current and voltage measurements from connected instrument transformers. The relay processes these inputs and evaluates them against programmed generator ratings, protection thresholds and timing settings. With the P1 option, the phase CT secondary circuits must be rated at 1 A, and the configured ratios must match the installed transformers.
Enabled protection elements monitor the measured conditions for faults such as abnormal current, ground faults, loss of excitation and other generator-related electrical problems. Depending on the application and enabled functions, the relay can operate an assigned trip or alarm output when its pickup and timing criteria are met. RTD inputs provide additional information for configured stator and bearing thermal protection.
The A20 option supplies 4–20 mA analog outputs for selected supported measurements. These signals can be used by compatible external monitoring equipment, provided the receiving input range and scaling are configured correctly. The enhanced display provides local access to operating information, while event and waveform records support post-event analysis.
Correct CT and VT ratios, generator settings, trip assignments and auxiliary power connections are essential to the protection scheme. Commissioning should verify the measurement circuits and the complete trip path rather than testing the relay in isolation.
The GE Multilin 489 serves as a local protection and monitoring device between generator instrumentation, breaker-control circuits and plant supervision equipment. It evaluates connected measurements and issues configured trip or alarm commands while supplying operating information for local and remote analysis.
| System Component | Function | Relationship to the Relay |
|---|---|---|
| 1 A Phase Current Transformers | Measure generator phase currents | Provide current signals matching the P1 input configuration |
| Voltage Transformers | Supply generator voltage measurements | Provide signals used by enabled voltage, frequency and power-related functions |
| RTD Temperature Sensors | Measure stator and bearing temperatures | Supply data for configured thermal protection and monitoring |
| Analog Transducers | Measure selected physical operating conditions | Supply supported analog signals for monitoring applications |
| Generator Circuit Breaker | Connects or isolates the generator | Receives a trip command through the assigned control circuit |
| Breaker Auxiliary Contacts | Report breaker position and status | Supply external status signals to configured digital inputs |
| 4–20 mA Receiving Equipment | Displays or records selected measurements | Receives signals from the A20 analog outputs |
| Plant PLC or SCADA System | Supervises generator operation | Uses supported communication data or analog measurements |
| Auxiliary Control Power Supply | Powers the relay electronics | Must meet the HI option’s voltage and frequency requirements |
| Application | Protection or Monitoring Requirement | Role of the Relay |
|---|---|---|
| Industrial Generator Sets | Detect abnormal electrical operating conditions | Evaluates enabled protection elements and operates assigned outputs |
| Combined Heat and Power Plants | Coordinate generator protection with plant electrical operation | Provides generator measurements, protection responses and diagnostic records |
| Standby Power Installations | Monitor generator condition during backup operation | Supports configured protection and alarm functions |
| Industrial Power Stations | Investigate disturbances affecting generator operation | Supplies event, waveform and measurement information |
| Generator Switchgear | Integrate instrument-transformer signals with breaker control | Acts as the local protection and monitoring layer |
| Generator Condition Monitoring | Combine electrical measurements with temperature or transducer inputs | Supports configured monitoring functions using connected sensors |
| Component | Function | Compatibility Consideration |
|---|---|---|
| 1 A Phase Current Transformers | Supply generator phase-current measurements | Match the P1 input rating and configured CT ratios |
| Generator Voltage Transformers | Provide voltage measurements | Verify secondary ratings, wiring arrangement and programmed ratios |
| RTD Temperature Sensors | Measure stator and bearing temperatures | Confirm supported sensor types and correct input wiring |
| Analog Monitoring Transducers | Provide signals for selected physical measurements | Verify output signal type and compatibility with the relay’s configured inputs |
| Generator Circuit Breaker Trip Circuit | Disconnects the generator following a trip command | Check output assignment, trip-coil requirements and control-circuit design |
| Breaker Auxiliary Contacts | Report breaker position | Confirm input assignments and expected contact states |
| 4–20 mA Analog Input | Receives selected relay measurements | Match the signal range and scaling to the A20 output configuration |
| RS485 Serial Network | Carries supported communication data | Configure compatible protocol, addressing and serial settings |
| Plant PLC or SCADA System | Displays generator status and measurements | Validate supported data mapping and communication configuration |
| Model | Product Type | Relationship | Selection Consideration |
|---|---|---|---|
| GE 489-P5-HI-A20-E | Generator Management Relay | Related configuration with 5 A phase CT inputs, HI power, A20 outputs and enhanced display | Consider when the installed phase CT secondary circuits are rated at 5 A |
| GE 489-P1-LO-A20-E | Generator Management Relay | Related configuration with 1 A phase CT inputs and low-range control power | Compare the LO input range with the available auxiliary supply |
| GE 489-P1-HI-A1-E | Generator Management Relay | Related configuration with 1 A phase CT inputs and 0–1 mA analog outputs | Consider when the receiving equipment requires the A1 output range |
| GE 489-P1-HI-A20-T | Generator Management Relay | Related configuration with 1 A CT inputs, HI power, A20 outputs and an enhanced display with Ethernet | Consider when Ethernet connectivity is required and verify the full order code |
The P1 option is intended for 1 A phase CT secondary circuits. The installed CT ratio, polarity and phase assignment must match the relay configuration so that current measurements and protection calculations reflect actual generator conditions.
Waveform records can help engineers examine electrical signals around a disturbance and correlate them with event records and protection operations. Their usefulness depends on the captured event, the available records and the configured recording settings.
Confirm that the receiving equipment accepts 4–20 mA signals, assign supported measurements to the intended channels, and verify scaling across the expected operating range. Compare remote readings with relay measurements before putting the monitoring loop into service.
Review the event sequence, available waveform records, enabled protection elements, configured thresholds and timing settings. Also verify CT and VT wiring, instrument-transformer ratios and breaker-status inputs before changing protection settings.