• ABB 560RTC03 R0001 1KGT012000R0001 RTU560 IRIG-B Real Time Clock
  • ABB 560RTC03 R0001 1KGT012000R0001 RTU560 IRIG-B Real Time Clock
  • ABB 560RTC03 R0001 1KGT012000R0001 RTU560 IRIG-B Real Time Clock
  • ABB 560RTC03 R0001 1KGT012000R0001 RTU560 IRIG-B Real Time Clock
Product Overview The ABB 560RTC03 R0001 1KGT012000R0001 RTU560 IRIG-B Real Time Clock is a timing and synchronization component for ABB RTU560 remote terminal unit systems. It supplies a common time ref……
ABB 560RTC03 R0001 1KGT012000R0001 RTU560 IRIG-B Real Time Clock
  • ABB
  • 560RTC03 R0001 1KGT012000R0001
  • IRIG-B Real Time Clock
  • Sweden (SE)
  • 185 × 30 × 100 mm
  • 0.35 kg
  • Xiamen, China
  • New & In Stock
  • T/T, PayPal, Western Union
  • 1 Year
  • 1-3 Working Days
  • DHL, UPS, TNT, FedEx and EMS.
  • 24-Hour Service
  • COO
  • 5

Our advantage

ABB 560RTC03 R0001 1KGT012000R0001 RTU560 IRIG-B Real Time Clock

Global Logistics

We have a 10-year logistics and express cooperation agreement, so our products can be shipped to any place in the world.

ABB 560RTC03 R0001 1KGT012000R0001 RTU560 IRIG-B Real Time Clock

Brand new and original

Our products are imported in bulk from the place of origin. Because of the cooperative relationship, our products are all original and 100% new.

ABB 560RTC03 R0001 1KGT012000R0001 RTU560 IRIG-B Real Time Clock

24-hour service

We provide 7*24 hours service to our customers. We will be there whenever you need us.

ABB 560RTC03 R0001 1KGT012000R0001 RTU560 IRIG-B Real Time Clock

Price advantage

All our products are priced very favorably because we have our own warehouse and supply.


Company Information
E-mail [email protected]
Mobile +8615980777398
Whatsapp +8615980777398
WeChat 15980777398

Product Overview

The ABB 560RTC03 R0001 1KGT012000R0001 RTU560 IRIG-B Real Time Clock is a timing and synchronization component for ABB RTU560 remote terminal unit systems. It supplies a common time reference to the RTU architecture, helping ensure that events, alarms, measurements, and status changes are associated with consistent timestamps.

In a substation automation installation, accurate time synchronization is particularly useful when several devices record events independently. The 560RTC03 works within the RTU560 system to maintain a coordinated time base so that information collected from different I/O and communication points can be correlated during normal operation and disturbance analysis.

The IRIG-B timing interface is commonly associated with precise time distribution in electrical power and industrial automation environments. A synchronized RTU can make event records more useful when engineers need to establish the sequence of switching operations, protection events, alarms, or communication-related disturbances.

During replacement or troubleshooting, the time synchronization path should be checked together with the RTU560 hardware, IRIG-B source, timing connections, and system configuration. A communication system can remain operational while timestamp accuracy is degraded, so time synchronization should be verified separately from ordinary data communication.


Technical Specifications

Parameter Specification
Model 560RTC03 R0001
Part Number 1KGT012000R0001
Product Family ABB RTU560
Product Type IRIG-B Real Time Clock
Primary Function Real-time clock and time synchronization
System Role RTU time synchronization interface
Time Reference IRIG-B
Application Substation automation, utility automation, and remote monitoring
Dimensions 185 × 30 × 100 mm
Weight 0.35 kg

Product Features

  • ABB RTU560 real-time clock component
  • IRIG-B time synchronization interface
  • Provides a coordinated time reference for RTU560 systems
  • Supports time-stamped event and status information
  • Suitable for substation automation applications
  • Useful for sequence-of-events analysis
  • Supports synchronization of remote automation equipment
  • Helps maintain consistent timestamps across RTU functions
  • Suitable for utility and electrical monitoring systems
  • Useful during event investigation and system diagnostics

Working Principle

The 560RTC03 R0001 receives a time reference through the IRIG-B synchronization path and maintains the real-time clock used by the RTU560 architecture. The synchronized time information is then made available to the relevant RTU system functions for event recording, alarms, measurements, and other time-dependent data.

The main purpose is not to transfer process measurements. Instead, it establishes a common timing reference so that information generated by different parts of the RTU system can be associated with a consistent time base.

IRIG-B Time Source → 560RTC03 → RTU560 System → Time-Stamped Events / Measurements / Alarms

If timestamps are incorrect or drift from the expected reference, engineers should check the IRIG-B source, timing wiring, synchronization status, and RTU configuration before assuming that the real-time clock hardware itself has failed.


Role in an ABB RTU560 Time Synchronization Architecture

The 560RTC03 occupies the timing and synchronization layer of an RTU560 installation. It works alongside the RTU processing, communication, and I/O functions to establish a consistent time reference for information generated by the remote terminal unit.

IRIG-B Source → 560RTC03 → RTU560 Processing → Time-Stamped Data → SCADA / Control Center

System Element Function
IRIG-B Time Source Supplies the reference time signal
560RTC03 Receives and maintains the RTU560 real-time reference
RTU560 Processing Unit Processes system information using the synchronized time base
RTU560 I/O Modules Acquire field measurements and status information
Communication Units Transfer RTU data to external systems
SCADA / Control Center Uses time-stamped information for monitoring and event analysis

Industrial Applications

Application Typical Use
Electrical Substations Synchronization of RTU event and status information
Substation Automation Providing a common time reference for automation functions
Power Distribution Coordinating timestamps across remote electrical equipment
Grid Monitoring Supporting accurate event sequence analysis
Utility Automation Maintaining consistent timing at remote sites
SCADA Systems Improving correlation of alarms and remote events
Protection and Switching Analysis Establishing the sequence of electrical system events
Remote Infrastructure Time synchronization for geographically distributed automation equipment

Installation and Maintenance

  1. Verify the complete 560RTC03 R0001 / 1KGT012000R0001 identification before replacement.
  2. Confirm that the RTU560 system requires the corresponding IRIG-B timing function.
  3. Record the existing time synchronization configuration before removing the unit.
  4. Isolate the relevant RTU equipment according to site maintenance procedures.
  5. Check the IRIG-B source and confirm that the reference signal is available.
  6. Inspect timing cables, terminals, and connectors for loose or damaged connections.
  7. Verify the polarity and connection arrangement of the timing interface according to the system documentation.
  8. Check the RTU560 processor and associated modules before concluding that the clock unit is faulty.
  9. After installation, verify that the unit recognizes the available time reference.
  10. Check the RTU system time against the external reference source.
  11. Confirm that newly generated events and alarms receive appropriate timestamps.
  12. Record synchronization status and test results for future troubleshooting.

Related Components

Component Function
ABB RTU560 Remote terminal unit platform
560RTC03 RTU560 real-time clock and synchronization component
IRIG-B Time Source Provides the external timing reference
RTU560 Processing Unit Processes synchronized RTU data
RTU560 I/O Modules Acquire field measurements and status signals
RTU560 Communication Unit Transfers RTU information to external systems
Timing Cable Connects the RTU timing interface to the reference source
SCADA System Uses synchronized event and alarm information

Recommended Related Models

Model / Product Family Product Type Typical Application
560RTC03 R0001 RTU560 IRIG-B Real Time Clock RTU time synchronization
1KGT012000R0001 RTU560 IRIG-B Real Time Clock Part Number Timing component replacement
ABB RTU560 Series Remote Terminal Unit Substation and utility automation
RTU560 Real Time Clock Components Timing Components RTU time synchronization
RTU560 Communication Units Communication Components Remote and supervisory communication
RTU560 Processing Units RTU Processing Components Data processing and control
RTU560 I/O Modules Remote I/O Components Field signal acquisition
IRIG-B Synchronization Components Timing Equipment Precise time distribution

Key Advantages

  • Provides a dedicated time synchronization function within the RTU560 architecture
  • Supports IRIG-B-based timing applications
  • Improves consistency of event and alarm timestamps
  • Useful for sequence-of-events analysis
  • Suitable for electrical substation and utility automation
  • Helps correlate information generated by distributed RTU functions

Technical FAQs

Why is IRIG-B synchronization important in an RTU560 substation application?

IRIG-B synchronization establishes a common time reference for the RTU system. This is useful when engineers need to compare events, alarms, measurements, and switching operations from different devices and determine their actual sequence.

What should be checked when RTU data is correct but the timestamps are inaccurate?

Check the external IRIG-B source, timing cable and connections, synchronization status, RTU configuration, and system time. If the RTU is communicating normally but the time reference is incorrect, troubleshooting should focus on the synchronization path rather than the communication network.

How can a technician verify that the 560RTC03 is receiving a valid time reference?

The external IRIG-B source should first be confirmed as operational. The timing connection and configuration should then be checked, followed by the synchronization status and RTU system time. Generating a controlled event and checking its recorded timestamp can provide an additional end-to-end verification.

Does replacing the 560RTC03 require checking the RTU560 configuration?

Yes. The replacement should be checked against the existing RTU560 timing architecture and synchronization settings. After installation, engineers should verify synchronization with the IRIG-B reference and confirm that time-stamped events and alarms are being recorded correctly.



Related Products

Get the latest price? We will reply as soon as possible (within 12 hours)

No:77501